This project was a new 50,000 ft² warehouse tilt building for ASU with a 6″ thick slab and 4 lb/yd³ of FiberForce 750 macro fiber. Fibers were specified for temperature and shrinkage control over a vapor barrier and 4″ aggregate base course.

APPLICATION TYPE: Slab on Ground
OWNER: ASU
ENGINEER: Advanced Structural Engineering
CONCRETE CONTRACTOR: Hardrock Concrete Placement Co., Inc.
READY MIX CONCRETE SUPPLIER: CEMEX
FIBER SUPPLIER: FiberForce
FIBER TYPE & ADDITION RATE: FiberForce 750 at 4 lb/yd³
PROJECT DATES & DETAILS: September 2020 – December 2020