Bedford Co. Agg Center

This project was originally spec’d to use 10 gauge welded wire reinforcement. Having to pump this into an existing structure with welded wire reinforcement on the ground created a lot of safety concerns. Using FiberForce 300 at a dosage rate of 1.5 lb/yd³ was the safe, cost-efficient, and time-efficient answer. The project did not have one crack in the 20,000 ft² slab that was poured all in one pour with a 4,000 ash mix on a 5 in slump using FiberForce 300 and was placed with a 31 m pump that had 180 ft of system.

APPLICATION TYPE: Slab on Ground
LOCATION: Shelbyville, Tennessee
OWNER: Bedford County
CONCRETE CONTRACTOR: Lee Adcock Construction
READY MIX CONCRETE SUPPLIER: Irving Materials, Inc.
FIBER SUPPLIER: FiberForce
FIBER TYPE & ADDITION RATE: FiberForce 300 at 1.5 lb/yd³
PROJECT DATES: November 2020

Get in touch

(205) 620-9889

sales@fiberforce.us

Physical address

Helena Industrial Park
545 Elm Street
Helena, AL 35080

Mailing address

P.O. Box 580
Helena, AL 35080

Send a message