Florence Canal Reach 2

The channel was slip form paved with 3 lb/yd³ of FiberForce 650 macro fiber reinforcement. The fiber was specified into the project by George Cairo Engineering. San Carlos has been using this fiber in channels to help mitigate cracking and increase durability. Fibers increase ductility which leads to a longer life of the concrete. SCIDD has been using fibers in their channel lining projects for over 10 years with success.

APPLICATION TYPE: Concrete Channel Lining
LOCATION: Coolidge, Arizona
OWNER: San Carlos Irrigation and Drainage District
ENGINEER: George Cairo Engineering

CONCRETE CONTRACTOR: RL Brosamer
READY MIX CONCRETE SUPPLIER: CEMEX
FIBER SUPPLIER: FiberForce
FIBER TYPE & ADDITION RATE: FiberForce 750 at 3 lb/yd³
VOLUME: 15,000 yd³

PROJECT DATES & DETAILS: October 2020 – April 2021