Sterling at Stonecrest used FiberForce 300 at a dosage rate of 1.5 lb/yd³ in lieu of 10-gage welded wire mesh. The fiber was used in the walking paths and sidewalks, totaling to 1,000 yd³ of concrete. The concrete has a broom finish in some areas and an exposed finish in other areas. By replacing the 10-gage welded wire mesh with FiberForce 300, the concrete contractor was able to save valuable time and money.