Bedford Co. Agg Center

Bedford Co. Agg Center

Bedford Co. Agg Center This project was originally spec’d to use 10 gauge welded wire reinforcement. Having to pump this into an existing structure with welded wire reinforcement on the ground created a lot of safety concerns. Using FiberForce 300 at a dosage...
Diamond Green Diesel Refinery

Diamond Green Diesel Refinery

Diamond Green Diesel Refinery This project was originally spec’d with rebar reinforcement of #5’s double mat on container slabs and heavy load high traffic paving. Choosing to use FiberForce T1-60, Type I steel fiber, helped cost savings on labor and...
City of El Mirage 121st Ave Wastewater Treatment Plant

City of El Mirage 121st Ave Wastewater Treatment Plant

City of El Mirage 121st Ave Wastewater Treatment Plant This project is a heavy equipment wash rack drainage system designed to remove dirt, grease, and oil from the wash water prior to it entering the water treatment plant. Team Fishel and FiberForce paired up to...
ASU Almeda Warehouse

ASU Almeda Warehouse

ASU Almeda Warehouse This project was a new 50,000 ft² warehouse tilt building for ASU with a 6″ thick slab and 4 lb/yd³ of FiberForce 750 macro fiber. Fibers were specified for temperature and shrinkage control over a vapor barrier and 4″ aggregate base...
Elk Ridge Builders

Elk Ridge Builders

Elk Ridge Builders This is a unique project where the owner of the project was also the Structural Engineer and General Contractor. For the 5 inch slab, the initial design called for number 4’s @ 24”. Martin Marietta Materials reached out to the FiberForce engineers...